When starting work on pouring the floor of concrete, you need to take out all unnecessary furniture from the room, so that in the future nothing interferes with your work. If there is an old floor that has already begun to collapse from time to time, then with the help of a grinder and a shock drill with a drill with a diameter of 12 cm, we remove everything to the bottom of the floor.