The total thickness of the concrete layer is usually 0.2 m.
4-02-2019, 17:25
Now the stage of filling the floor and walls is coming. Stones are poured to the bottom of the pool, and a reinforcing mesh is laid out on them. On top it is poured with concrete. The total thickness of the concrete layer is usually 0.2 m. The bottom is made with a slight slope to the place of water drain. The entire perimeter of the pit is decorated with good wooden formwork. High -quality installation will provide wall strength and attractive appearance of the pool. To strengthen the wall between the formwork and the ground, a special mesh is installed, then liquid concrete is poured on top. After the concrete solution is hardened, the formwork is removed, the walls and floor are processed with cement milk.